La mayor onerosidad fortuita en el contrato de obra pública
This paper seeks to answer the question as to which party must assume the hardship caused by fortuitous events in public construction contracts. For this purpose, it is necessary to determine the mechanism for the restoration of the equilibrium lost due to this event, which makes it necessary to dis...
Saved in:
Main Author: | Arancibia Mattar, Jaime |
---|---|
Format: | Article |
Language: | Spanish |
Published: |
2023
|
Subjects: | |
Online Access: | https://dialnet.unirioja.es/servlet/oaiart?codigo=8990641 |
Source: | Revista Derecho del Estado, ISSN 0122-9893, Nº. 56, 2023 (Ejemplar dedicado a: Mayo - Agosto), pags. 335-362 |
Tags: |
Add Tag
No Tags: Be the first to tag this record
|
Similar Items
-
La gratuidad como elemento esencial del contrato de comodato. El comodato en interés del comodante
by: Rabanete Martínez, Isabel
Published: (2020) -
Crisis económica y alteración extraordinaria de las circunstancias del contrato: ¿pacta sunt servanda?
by: Vivas Tesón, Inmaculada
Published: (2013) -
Los riesgos imprevistos en el contrato de obras
by: Fernández, Tomás-Ramón
Published: (2016) -
El restablecimiento de las condiciones contractuales frente al desequilibrio sobreviniente en el derecho privado colombiano
by: Polidura Castillo, Adriana
Published: (2017) -
Sobre el desequilibrio económico en materia de pensión compensatoria: Algunas novedades jurisprudenciales. Comentario a las ssts núm. 495/2019, de 25 septiembre 2019, núm. 100/2020, de 12 febrero 2020, y 29 junio 2020 (rec. 3672/2019)
by: Verda Beamonte, José Ramón de
Published: (2021)